721
VB and the development of wizards / Re: Auto zero VB script imperial to metric conversion query
« on: December 12, 2017, 09:12:35 PM »
Yes, G4 P3 is Pause 3 seconds.
Code "G90 G31Z-100" means probe down in Z 100mm.
Mach3 works in units/min, so 5mm/sec would be 300mm/min
Code "G90 G31Z-100. F300"
Code "G0 Z20" will rapid to Z= 20mm, which would be 14mm above your plate.
Code "G90 G31Z-100" means probe down in Z 100mm.
Mach3 works in units/min, so 5mm/sec would be 300mm/min
Code "G90 G31Z-100. F300"
Code "G0 Z20" will rapid to Z= 20mm, which would be 14mm above your plate.