3251
General Mach Discussion / Re: g41 - Tool Compensation Help
« on: May 25, 2013, 06:54:59 AM »
The lead in move needs to be at least 1/2 the tool diameter, preferably a little more. .01 probably won't work.
This section allows you to view all posts made by this member. Note that you can only see posts made in areas you currently have access to.
I looked at General Config after loading my code with added G91.1, and the Absolute IJ button is still selected?
I have to admit... I'm confused by the use of absolute distance combined with incremental IJ?
In addition to changing the G90.1 to G91.1, should General Config also be changed to Incremental IJ?
The attached file has the G90.1 line added, but was not there during the run.