I havent gotten it to work 100% but I read your post on your threading tolerances increasing drasticly with the upgrade to .008 , loaded the latest development version and its doing much better. I decided to thread the 400+ tubes I need on the other lathe and get back to this one when I can get another smooth stepper. I really need to get this one threading as it has a 3" hole thru the spindle, 30hp spindle motor , 12 station tool changer etc etc.
I sent the fellow at warp 9 an email this past weekend but havent heard anything back. I was hoping to get one in hand before the week ends , plenty of other stuff to do in the meantime.