Hi to all. I have read in a forum that the number in the playpen Step for unit it is critical. When Mach3 is installed this number is planned to 2000. I have a microstep controller RTA planned to 800 passi/giros and a screw with pitch 4mm. I have planned the number step for unit to 200. Is it correct? Thanks in advance. Giordano.