we did other tests.
correctly entered the values in the spindle boxes, therefore the turns are programmed / real (within a minimum space).
first anomaly, the Accel and Decel Time values are ignored.
The real problem lies in the coordination between CCS and droSpinRPM.
all the Fedds per lap (G99) are wrong !!!
The worst was with the G76 cycle.
to get the real step we have to deliberately give an incorrect value in F.
we were forced to divide the thread of the relationship.
example
2 / 0.517 = 3.868 (2=pitch 0.517=ratio)
therefore in G76 the Feed had a value of F3.868
understand immediately that there are big errors between plugins or Mach4!
however, including deception, we tried the thread.
the real step has finally been corrected!
another negative thing is that the thread is ugly.
exceeding the cycle of the wire to reach the right size, the triangle of the wire is slightly ruined, it does not always start from the same position !!
repeats several times and gradually increases the error on the triangle!
we are very demoralized and angry about this.
I declare that the mechanical and electrical parts are perfect, so the problem is only software !!.