Hi All,
I am being very dim at the moment trying to setup a set of 5 interchangeable toolholders on my lathe running MSM Turn (not mill-turn) and I seem to be going around in circles.
mach3 is at 067, MSM version is 2.09
Can anyone give me a step by step sequence, ideally using the reference point as the Master tool, otherwise using a defined tool as the Master, all based on the MSM screens?
I thought that something existed but I cannot find any links.
Thanks,
Simon