Ok, an update on the enclosure. I have it just about finished but there are quite a few things I still want/need to do yet.
- upper lighting
-cutting doors into the clear side walls for those longer jobs that I may have someday
- possible upper venting if need be
- Sealing for coolant
- Tool/wrench holders and such
I added an E-Stop to the left rear which is real close to my lathe. It'll be within arms reach just in case I hear anything "crunchy" going on in there lol!
I'm loving the full open front as I need to be able to "get around" in there for various things.
I also moved the spindle to the right rear which is a nice feature and moved the air pump for the nozzle into the cabinet below.
The gas lifts for the door are perfect and I have Mcmaster to thank for that as their directions for figuring what you need are excellent.
Here are a few pics for you: