I just finished my mill conversion and installed Mach 3. Limit switches are wired and working OK.
Here are my questions. How do I set the limits for the table??? When I zero reference, the z goes to the top of the tower, as it should and the table moves to the far right and to the rear (toward the tower).
My DRO has values other than zero so how do I reset those?

If I load a job (roadrunner), the job view is off the red square which indicates the table. If I move the table so that the cross hairs are in the table are and reference, all appears well until I try to run the job. Then one axis hits a limit switch and stops everything. I have rescaled to .5 to try and get everything in the table area but the table still hits the limits.
Is there a tutorial or directions on how to do the initial setup???
All help is appreciated.
I know I'm close and it's frustrating. I've been working on this project for months but still need to learn a lot.
Thaks for the time.
billyjack