Build ThreadIt is Sunday and we are going to do drill tests today. It is going to be our last day in Sadiqabad (hopefully

). It will be our third Sunday here and Khalid has been with us all those week-ends.
Khalid has modified the post processor for Visual Mill and has put in extra M-codes for locking and unlocking the drill head during each drill cycle. He makes a sample program and we are ready to go. Put a center drill in the drill chuck, center the work piece, adjust height of tool and we press the start button. Works smoothly and finishes the cycle. Now put in a 20mm drill, edit the drill depth and run it again. Within half an hour we are through with the drilling.
The coolant pump is in operation too but the coolant drain system is not finished yet. So we apply a little amount of coolant manually for this operation. Measured the holes, inspected the drilled hole finish, noted down the speeds and feeds. Every thing is perfect.
Last few hours are spent in putting on different indicators on the machine. We leave Sadiaqabad at night and by next morning we are in Karachi. Right on time for my daughter's birthday

.
Guards for the Y-axis slide ways and the ball screw are in fabrication shop. I have to go to Sadiqabad again next week to look after the installation of guards and also discuss a few more accessories for this machine. More photos and vids to follow that visit.
https://www.facebook.com/photo.php?v=4613441528770