I am cutting wood products, so there's little concern for tool breakage. I set my Z to touch the work stock before I start cutting. However, at times due to mild warping, the toolsdoes not fully cut through the work.
Other than changing the length in G code to a longer depth, is there an easy way to do it with Mach on a temporary basis? I know I can "fake" the z number before regenerating the toolpath, but then I cannot ever use the "go to zero" because the tool would dig into the surface.
Thanks in advance.
tc