I have looked through the other posts and cannot find anything on this ... but is there a way to synchronize slaved axises?
For example, on my machine it takes 3052 pulses for the x axis to travel 1". It takes 3054 pulses for the slaved A axis to travel the same distance. Not a big difference, however with the axises slaved together, at the end of a 96" travel, the A axis lags behind the X axis by about 1/16" - which is a problem.
I have changed the "steps per" settings on the A axis, but it has no effect on the travel distance. It appears that if the axises are slaved, then both axises are sent exactly the same number of pulses (ie what is under the "X" axis setting)
Although I am sure this is a mechanical issue - one pinion gear must be slightly closer to the gear rack than the other - I am sure it would be much easier to fix using software, if that is possible.
Help!