Oh man, that makes sense.  
I don't want to enter any information into the DRO, so I will use the update script.  I simply want to update the OB1 axis position.  
When it goes over 20, I want it to start back at 1.  Is that possible to do, alter the OB1 Axis Position?  If not, it is fast enough just using the C Axis, but I was really hoping I could figure out how to allow it to use the fastest route along the Carousel to get to a tool.  You know, 19 ---> 1 is only 2 tools away instead of 18.  
I've helped a buddy write a PLC ladder that finds the fastest route along the carousel, so I have most of the math heaving lifting done if I have to resort to using Incremental moves, but that would absolutely require me to be able to update the current position of the OB1 axis.