« on: December 30, 2018, 01:38:08 PM »
Hi guys, ..... first of all I'd like to send my greetings for the festive season to all you people who make up this great family.
So, after some while on radio silence, I've been doing work on my second build and as promised attached are some photos of my progress so far. Nothing out of this world but if this gives ideas tto other poeple then the purpose of sharing would have been reached.
So far I have installed all servo motors, homing and limit switches, drivers electrical system, lubricating tubes to all ball and linear bearings. The 130W laser is on its way and is due to arrive in mid / end February along with the power supply, cooling temperature controller and the whole lot.
Furthermore I've done a dry run and checked the total working volume and all is so far as planned.
Anyway below are the pics.
Regards
Marting