21
Mach4 General Discussion / Re: X move starts before Z move finishs
« on: July 22, 2019, 09:31:56 PM »
I have tried the G61 and it cures one problem but it is so jerky doing compound curves etc that I can't use it
Also doing hi speed cut outs with G64 it cuts external 90 degree corners fine but internal corners 90 degree corners it puts a large radius instead of a sharp 90 degree corner and this radius is related to the speed of the feed so to my mind is not following the tools path and I think it is impractical to put a G61 before every internal corner and a g64 after and don't think the post processor could figure out to do that either
So I am at a bit of a loss how to tackle the problem
I am using a router and feed of 120 inch per minute and need to get down to say 6 IPM to make is follow the desired tool path
Regards Ray
Also doing hi speed cut outs with G64 it cuts external 90 degree corners fine but internal corners 90 degree corners it puts a large radius instead of a sharp 90 degree corner and this radius is related to the speed of the feed so to my mind is not following the tools path and I think it is impractical to put a G61 before every internal corner and a g64 after and don't think the post processor could figure out to do that either
So I am at a bit of a loss how to tackle the problem
I am using a router and feed of 120 inch per minute and need to get down to say 6 IPM to make is follow the desired tool path
Regards Ray