1
General Mach Discussion / Un-synchronize an axis.
« on: October 09, 2013, 10:24:19 AM »
Hi-
I'm using my #6 (C) axis as part of a loading system on my lathe. As such, I want to be able to move X and Z without them waiting for the C move to complete. How do I configure this?
Thanks,
Tom
I'm using my #6 (C) axis as part of a loading system on my lathe. As such, I want to be able to move X and Z without them waiting for the C move to complete. How do I configure this?
Thanks,
Tom