101
General Mach Discussion / Re: Feedrate really slow when running a line with G43
« on: September 05, 2006, 08:27:58 PM »
Brian, Here is the Code in my file right after the tool change.
T1 M06
G20
S10000 M03
G53G0 Z0
G00 G90 X1.0914 Y1.4791
G43 H1 Z2.
The last line is the line it is on when its moving down to the starting position for the job.
I tried using the feedrate thing we discussed on the phone, but the feedrate showing on the DRO is 60 but it is only moving as fast as the speed I used for the last Tool Hieght probe move.... Any Suggestions?
M
T1 M06
G20
S10000 M03
G53G0 Z0
G00 G90 X1.0914 Y1.4791
G43 H1 Z2.
The last line is the line it is on when its moving down to the starting position for the job.
I tried using the feedrate thing we discussed on the phone, but the feedrate showing on the DRO is 60 but it is only moving as fast as the speed I used for the last Tool Hieght probe move.... Any Suggestions?
M