9
« on: April 27, 2012, 12:37:34 PM »
They ask me about this
> 1. 5 axis machine configuration (Head-Head / Table-Head/ Table-Table)/ --- we know this : Table-Table is your configuration./
> 2. Information on Primary and Secondary axis.
> (For example: A head-head configuration, the Primary axis is about Z axis and the Rotation axis code is represented by the letter "C' and secondary axis is about Y axis, rotation axis code , is represented by the letter "B")
> 3. G & M code specifications from the controller manual
> 4. Information on canned cycles for drilling, tapping, boring operations, (G81 - G89)
> 5. Arc output formats for Circular interpolations (G02/G03),
> 6. Start and End Block information
> 7. Tool Change definition
> 8. A sample g-code that has 5th axis
answer if someone will notice some mistake, correct please
1.) Table - Table
2.) Primary axis I think would be about the X axis (A) and the secondary axis would be about the Y axis (B)
3.) Standard G and M codes will be fine. If you need more I have attached a file for you with the G and M codes
4.) See attachment
5.) See attachment
6.) Standard safe startup block will be fine ( "G80 G40 G00 G50 G90" ) at the end of the file you only need to have an M30
7.) Tool change is only the tool number and M6 So to change to tool 5 you would have the following line "M6 T5" . Tool length offsets are activated by doing a G43 H<height register> (Like Fanuc)
8.) I don't have any 5 axis files here but I would be willing to simulate them here to see if there are any problems. A 5 axis move would be "G91 G0 X 1.0 Y1.0 Z1.0 A1.0 B1.0"
If someone has 5 axis g-code please give me