Hello Guest it is April 24, 2024, 07:54:05 PM

Show Posts

This section allows you to view all posts made by this member. Note that you can only see posts made in areas you currently have access to.


Messages - khalid

Pages: « 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 »
62
Here are the pictures. Hope you will edit the videos and post..The flanges are 900mm diameter..

63
Zafar , Our Fertilizer Plant Annual Turnaround started. We have got lot of jobs including the two 90mm thick Carbon Steel blind flanges. 24 number of holes . The final hole size is 50mm. Holes being drill in 04 steps:
1- Centre Drill
2- 20mm Drill
3- 40mm drill
4- 50mm drill
The step one and two completed in 3hours... The third round in progress..I hope i will get all hole drilled in night shift.. I sent you zip file of videos and pictures.. i will post the final pictures of finished part tomorrow.

64
I know your hardwork, devotion, dedication, innovation, and all the words that ends with..tion.... to this project.. I must say you are a real engineer... :) I am really proud of NED university of Engineering and Technology for giving such brilliant engineers to our country...

65
NOW yu know why everyone else in the world was buying up ALL of our old machines. What we saw as junk they KNEW was just a refurbish away from being better than new iron again. It was all well seasoned. 

(;-) TP

You are right. The castings around and before 80's were much better than the ones we get these days. For heavy structures we always head towards the local junkyards first. It sometimes becomes difficult to explain this to the customer though ;-)

Zafar, you knew well the use of Planner bed for this machine was my IDEA..have you remember...;) and getting the BUTLER bed was your idea..i love Old European make machines... They made it strong and they put their best brains and mind in  designing these machines...

66
The X and Y axes alphabets has to be swapped ( These are Vnyle printed Letters)..That was my mistake .. been busy in a hectic turnaround in fertilizer industry... The Coolant drain system is very simple and innovatively designed.. Will soon post some more pictures in couple of days... The Video is 85Mb and still trying to shorten it....;)
Zafar you know my interdepartmental transfer was due last year but was not done due to this conversion.. I hope i will be in INSPECTION section(being there is my dream) of my fertilizer plant after this Turnaround.. I wish some jobs on this machine comes during the maintenance activities of plant and we do it timely, accurately and get the payback in the first ever CNC job on this machine...

67
Can we run this with solar generated steam and make some electricity?

68
Zafar..it was 5mm sag at support position. We have reinstalled the bed and checked the movement (we didn't alter the Velocity/acceleration parameters in Mach3)...the movement are pretty smooth..The middle support will enhance the life of the ball screw and overall integrity of machine...

Meanwhile we have fabricated the walkway platform and it is under sandblasting...hope when you come you see some more improvements.. Oops i forget, if you can check the availability of misc WARNING SIGNS in karachi..

69
Wow..nice to see the machine here...

70
Feature Requests / Re: REF ALL HOME - on start-up MACH3
« on: April 08, 2012, 01:12:42 PM »
Amazed to see your knowledge about Mach Gerry:)

Pages: « 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 »