Hello Guest it is April 18, 2024, 11:53:46 AM

Show Posts

This section allows you to view all posts made by this member. Note that you can only see posts made in areas you currently have access to.


Messages - khalid

Pages: « 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 »
121
Here is the updated pictures of spindle housing being machined on Boring Mill and the completed tube sheet.

122
Hi Hood ,
I have now to enlarge these 8mm holes to 9.5mm... Now I am going to do it with Standard Drill Cycle (G81).. Is it right? what mm/min i should travel the drill and at what RPM?
Regards

PS:
or anyother suggestions for 9.5mm holes.!!!

123
Started building new Spindle and its houseing.. The Spindle is off AISI 4140 hardened to 55HRC... and now it require grinding... The Vertical column is also in fabrication phase.. I will get red of complete Radial drill except the Cross-slides..
The New column is very sturdy..

124
Looks to be working well :)

Think I would be spinning slower and feeding harder though.

Hood
Yaa.. The system is working well now... Following is my experience:

1- The HSS drill failed on the Second hole... I kept the RPM 800 and G73 cycle with Peck 6mm.. It simply toasted;) Flood coolant was On... 2min/hole

2- The second bit is used was Carbide, It ran for 30 holes and then suddenly break into 3 pieces... Again G73 peck cycle but with 2.5mm peck... 2 minute/hole

3- I then used  HSCO drill and with G83 Cycle, lost it after 38th hole with 2.5mm peck... Coolant on.. 7minute /hole

4- Keeping all above experience in view, i again used HSCO drill but at this time G83 with 2mm peck (DOC) and after each 15 holes i sharpen the drill.. For this i added tool change command after each 15 holes in my Gcode.. i slightly changed the Gcode for downtime...
The above strategy went very good and i did above 100holes without breakage... 5minute /hole

5- I have HSS drills available, so i tried the same G83 cycle with them with 2mm peck and sharpening after each 15 holes..and i did 50 holes without loosing HSS drill.. 4.5min /hole

I have done 224 holes in 16.8 hours.

125
This is a very Nice suggestion Hood... For this i would have to complete the bed first and then phisically measure the torque... Thanks for posting.

126
I have started drilling SS-316 tube sheet 30mm thick:
Spindle RPM: 800
Feed: 1 IPM
Peck drill Cycle: Deep Drill
2.5mm cut per Peck
The drill retract above the work piece after each 2.5 depth cut.

HSCO drill: 8mm

After 37 holes contineously , Without sharpening the tool.. The drill break down on 38th hole..
Now after each 20 holes i am planning to sharpen the drill.
Time to complete One hole 30mm deep: 7Minutes

127
Hi,
I need advice from you guys for converting the Radial Drill Machine to CNC...  As i have no experience with Servos..and especially converting this machine is a big job for me..and it bad experience will get my carrier down... But i will take the risk with the help of you guys..
I figured out the length of BED= 1800mm x 1600mm
Also the Weight of the bed it has to carry = 2000Kg

I checked that the Motor at the Top of the Column is 3 Phase 2 KW AC motor.. and it can raise the whole ARM along with the Heavy spindle with 70IPM ...I have seen this.. About Diameter: 2 inch ACME screw get the whole Arm Load up and down very easily..


Should 2.2KW AC servos at all 3-axis will work or enough for me?.. I have not to raise the Arm up and down... I have just to move the spindle up/down..The Whole Spindle lateral movement (X-axis) and the Bed as a Y-axis..

Best Regards for help...

128
keep continuing..very nice writeup..

129
Show"N"Tell ( Your Machines) / Re: Got My mill running :)
« on: June 22, 2010, 11:46:22 AM »
Wish to see the video that is not working now!!!!

130
I must say Rene is genious.. I wish i have time for working with him... hi, Rene once your working completed i will make the changes in Gcode embroidery software..

Currently very busy in other projects...:(

Pages: « 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 »