55
« on: March 16, 2016, 10:29:48 AM »
Good morning, I have a question for the Mach 4 gurus on this site, as i'm trying to wrap my head around this and not getting anywhere fast, LOL. How does the system use the max spindle and Max motor speed. Does it use it to as a gear ratio then male the adjustment to the vfd 0-10v signal? Also is the Feedback ratio only used for closed loop functionality? I'm going to layout a scenario and could someone please tell me if i am on to something or hanging out in the breeze somewhere?
Example Scenario: If i set min spindle speed to 0, and Max spindle speed to 5000, and the Max Motor Speed to 3600. will mach figure out how much voltage (between 0-10V) to send the vfd using some formula and the 5000 and 3600 values from the Max Spindle and Max Motor Speed, if i command an m3 s2500, or m3 s950
MinRPM The minimum RPM the spindle in the selected range
MaxRPM The maximum RPM the spindle in the selected range
Feedback Ratio
By default the Feedback ratio is 1, a value of one is used in an application
where the feed back device is mounted on the spindle. If the feedback device is
mounted on the motor or some other part of th gear train the feedback ratio
can be used to get the correct speed.
Max Motor RPM
The maximum RPM of the spindle motor. The reason for the maximum RPM is to allow for proper
scalling of the motors RPM on all ranges. The motor RPM is used by motion devices, plugins, VFD's, Lua
etc for planning the proper motor RPM to get the requested spindle RPM.