Build Thread
Two weeks to go before the final deadline (which was revised to 8 months when we last left Sadiqabad). I get a call from customer that bed is placed on the new foundation and we can come over to finish it over. I prepare my team and leave for Sadiqabad again. 10 hours drive.
The bed is on the foundation, levelled and fastened. They are going to plaster the sides of foundation today. Masonry work won't stop us from doing light work on machine. We install the Z-axis motor with new belt and also put the X-axis motor in place.
Next day, the table is taken off the bed to install the auto-lubricating pump, it's pipes and nozzles. Mr. Nooruddin starts laying out wires for motors' encoder and power cables. Next task is to align the Y-axis screw.
Two weeks to go before the final deadline (which was revised to 8 months when we last left Sadiqabad). I get a call from customer that bed is placed on the new foundation and we can come over to finish it over. I prepare my team and leave for Sadiqabad again. 10 hours drive.
The bed is on the foundation, levelled and fastened. They are going to plaster the sides of foundation today. Masonry work won't stop us from doing light work on machine. We install the Z-axis motor with new belt and also put the X-axis motor in place.
Next day, the table is taken off the bed to install the auto-lubricating pump, it's pipes and nozzles. Mr. Nooruddin starts laying out wires for motors' encoder and power cables. Next task is to align the Y-axis screw.