11
Mach4 General Discussion / Probe 2 setup, Pokeys57cnc
« on: February 14, 2021, 02:15:52 PM »
Usual disclaimer...I'm electronically challenged.
Using Mach4 and Pokeys57cnc on a G0704 converted mill, manual tool change. I have a probe that is working for probing material and now want to add a tool height touch off.
Attached are photos of the electronics and PoKeys and Mach4 settings. You can see the ribbon connections and the red line. I think those are oriented correctly. The blue wires are attached to pins 17 and 6 on the db25 connector and I get a full 5 volts through. Can anyone tell me why I cannot get the Pokeys or Mach to read a change when contact is made with the wire ends?
Any help is greatly appreciated.
RT
Using Mach4 and Pokeys57cnc on a G0704 converted mill, manual tool change. I have a probe that is working for probing material and now want to add a tool height touch off.
Attached are photos of the electronics and PoKeys and Mach4 settings. You can see the ribbon connections and the red line. I think those are oriented correctly. The blue wires are attached to pins 17 and 6 on the db25 connector and I get a full 5 volts through. Can anyone tell me why I cannot get the Pokeys or Mach to read a change when contact is made with the wire ends?
Any help is greatly appreciated.
RT