2451
Mach3 under Vista / Re: Mach3 Axis Calibration Mystery
« on: February 21, 2017, 09:55:24 AM »
Obviously you have some of your machine information wrong (maybe microstepping ?, maybe pitch ?).
The last line in your calc. (Screw lead is 10 mm (pitch x starts). My screw will have to turn 0.1 rounds to move the nut 1mm. 1.0 divided by 0.100=10. So 3,200 X 10=32,000) should be 3200 / 10 = 320.
However, the important thing is that you have it sorted.
Tweakie.
The last line in your calc. (Screw lead is 10 mm (pitch x starts). My screw will have to turn 0.1 rounds to move the nut 1mm. 1.0 divided by 0.100=10. So 3,200 X 10=32,000) should be 3200 / 10 = 320.
However, the important thing is that you have it sorted.

Tweakie.