Hello Guest it is April 27, 2024, 12:20:22 PM

Show Posts

This section allows you to view all posts made by this member. Note that you can only see posts made in areas you currently have access to.


Messages - bbchevy396

Pages: 1
1
Sorry guys, I wasn't clear on my previous post. I'm running the scribe with a pneumatic cylinder, and controlling it with a selenoid from the #2 output.

The mechanics all work beautifully. I ran some Gcode test moves today, and I can get approx 500ms pause with a Go4 command, or no pause at all. This is exactly the same issue the original poster had, when trying to get a 100 - 300  millisecond pause.
It appears that a 500ms pause is no problem... anything less, and mach wont do it.

After reading some other threads on the same issue, it appears that a VB script marco, with a sleep command WILL do the short pauses... that a G04 command wont.

Now.... since I have no idea how to write a macro, could someone offer me a few pointers on the basics?
All I'm looking for is a macro that has  a "sleep 100" line that will work, and I can modify the pause length.

thanks for the help!

Jim

2
I am having exactly the same issue in timing a pause at the end of a scribed path, on my CNC table, to allow the scribe to lift from the plate before a rapid move to the next cut-path. It is either too long of a pause and leaves a divot from prolonged contact in one spot, or  too short (no pause) and leaves a "leadout" looking scribed mark as it heads rapids to the next part.

Any help? Sorry to jack this thread.

Pages: 1