1
General Mach Discussion / Re: Mach and Closed Loop DRO Operation
« on: May 18, 2015, 08:07:21 PM »
Yes, the fault signal will become part of both a hardware stand alone E-stop and the logic-E-stop before the machine is put into operation. Currently it's in a test configuration while the mechanical issues are identified and corrected.