1
General Mach Discussion / Re: Missing steps on direction change
« on: February 19, 2020, 02:56:49 PM »
Mach 3 both x and y axis shift zero during job . I did a test back and forth 1 inches hundred time and at the end goto zero command is send and it moves 2 mm away from zero