Hello Guest it is April 18, 2024, 08:09:00 PM

Show Posts

This section allows you to view all posts made by this member. Note that you can only see posts made in areas you currently have access to.


Messages - jsmithwe

Pages: 1
1
FAQs / Re: G81 canned drill routine too slow to position
« on: March 16, 2009, 03:48:40 PM »
Thanks for making me look.  It DOES rapid between holes.  Nevermind but thanks.

2
FAQs / G81 canned drill routine too slow to position
« on: March 14, 2009, 12:15:38 PM »
I am trying to figure out how to change the feedrate to rapid position between holes in a 28 hole g81 routine.  My code looks like this:

G81 x0 y0 z-0.9 ro.1 f5
x1.25
y0.75
x0
y1.5
and so on......

The feedrate f5 is great for drilling but way too slow when positioning.

Pages: 1