Machsupport Forum

Mach Discussion => General Mach Discussion => Topic started by: sgaugetrains on May 16, 2017, 06:50:50 PM

Title: I need a simple step by step instrutions on setting up an ATC in Mach3
Post by: sgaugetrains on May 16, 2017, 06:50:50 PM
I am a dummy when it comes to programming. I use a conversational g code programmer. But after that I'm am lost.
I have a Colombo ISO 15 auto tool change spindle and have set up all the air controls and valves to operate it.
I have build a side rack tool holder that needs to have the tool holder move in from the side and then unlock and go up.
But I have tried looking at all the macros and other stuff and can not even start to under stand. Weirdly , I can program I/O electrical plc's. But not this.
I am willing to pay if needed.

Thanks, Sam
Title: Re: I need a simple step by step instrutions on setting up an ATC in Mach3
Post by: ger21 on May 17, 2017, 07:52:22 AM
If you look in the videos section of the Machsupport website, there's a tutorial video on writing a tool change macro, and the sample macro used in the video is available for download.
If that's not enough, you may need to pay someone to write a macro for you.
Title: Re: I need a simple step by step instrutions on setting up an ATC in Mach3
Post by: sgaugetrains on May 19, 2017, 06:36:13 PM
Thanks for the reply , who could write one for me ?