Hi I'm a newbie here. I have a Taig CNC and Rhicam. I set Feed Rate at 800mm/min with 10k RPM on Spindle.
According on calculation on Rhino Cam, running time should 1 hour 28 min. However, when I upload to Mach3 Estimate Program Run time is 6 hour 30min instead.
What is wrong here?
-
Rhino is calculating the time on the parameters it has set and Mach is calculating the time on the parameters it has set and there is a good chance that the two lots of parameters are not the same.
For example acceleration settings can make a huge difference in the GCode program run time even if the set feedrates between Rhino and Mach are the same.