6621
General Mach Discussion / Re: Combine G73 and G83 Peck Drill Cycle!!
« on: July 03, 2010, 10:26:20 AM »
It is done all the time (;-) When drilling tube we also use another trick drill throught the top section then reset the R level just above the bottom section that way when mach drills trought the top it will rapid done to the next level and continue. Savea all that drilling air.
Just makes sure to reset the R level when you have completed the hole OR you will snap the bit whn Mach tries to move at the low Rlevel inside the tube.
G73 X0.000 Y0.000 Z-0.1 R0.100 F10
Z-1.000 R-0.900
R 0.100
G80
Just makes sure to reset the R level when you have completed the hole OR you will snap the bit whn Mach tries to move at the low Rlevel inside the tube.
G73 X0.000 Y0.000 Z-0.1 R0.100 F10
Z-1.000 R-0.900
R 0.100
G80