Machsupport Forum
Mach Discussion => General Mach Discussion => Topic started by: Chaoticone on October 09, 2006, 07:03:16 PM
-
Does anyone see a problem with me using a battery backup for my control PC. It'll probably be an APC. I think APC power chute will have to run in the background for it to work as it should.
-
I use a triplight line conditioner as well as a UPS :)
Triplight on the servo/Stepper drives and a ups on the PC.