Next step is to get  220 power to the mill.  One leg will supply power to this little transformer (control  voltage for the viper) and both legs will supply  220  power to the high voltage power supply
there will be another power supply for the breakout board and one to run the relays for the air solenoids ect. slowly working through this. 
archie =) =) =)