I have 2 fixture plates from HTS that are already drilled and tapped with 170 holes on a 1/2 grid pattern. How would i go about pinning the fixture plate to the mill table properly. I guess my biggest confusion would be squaring it up first and then drilling where the dowel holes are in the mill table already. How should you square the fixture? I could put 2 pins a certain distance apart and then put a peice of steel square stock against them and use a DTI to set the stock square inturn squaring the dowel and table

??just thinking out loud.