Here is a good link on bonding and grounding from Siemens.
http://www.automation.siemens.com/doconweb/pdf/840C_1101_E/emv_r.pdf?p=1All metallic parts of the machine should be bonded to Earth Ground to avoid ground loops.
In Canada the grounded Neutral is a secondary centre tap 120-0-120, in most other parts of the world the supply is 240 to a grounded (neutral) star point of a 3 phase transformer.
N.